A10 Reitdamm BridgePrestressed concrete bridge on the A10 Tauern Motorway between Pongau Junction and Hüttau
Obervermunt Plant (OVW II)An environmental impact assessment and statement were produced for the Obervermunt plant II with a turbine and pump capacity of 360 MW and design flow rate of 150 m3/s.
Vienna Metro Line U1/9 – Altes LandgutExtension of the line U1 - urban tunnel construction directly beneath the motorway junction Favoriten and the A23 bypass
S6 Semmering express road General refurbishment of Niklasdorf TunnelNiklasdorf Tunnel - refurbishment of a tunnel in limiting equilibrium
Site supervision BettlerkreuzRefurbishment of sub-surface road sections Bettlerkreuz and Kreuzergegend