• Company
  • Services
  • Projects
  • Research & development
  • Contact
image
News

Order placed for new line Gelnhausen – Fulda

IGT-IL-GC-LAP Order placed for new line Gelnhausen - Fulda

image

Contract award for site supervision of Brenner Base Tunnel lots Wolf and H41

image

Geomechanics Colloquium 2021

The Austrian Society for Geomechanics will host the 70th Geomechanics Colloquium in Salzburg from 14.-16.10.201

image

Salzburger Businesslauf 2021

Zum heurigen Businesslauf versammelten sich sechs unserer geschätzten Kolleg:innen, um die Ehre der IGT zu verteidigen.

  • image

    Auftragserteilung Regionalstadtbahn Salzburg

    14. September 2021—

  • image

    S16 Arlberg Schnellstraße Arlbergtunnel Teilsanierung 2

    21. May 2021— Auf der S16 Arlberg Schnellstraße wird der Arlbergtunnel einer Teilsanierung unterzogen. IGT in ARGE mit Lechner & Partner und 3G Geotechnik wurde von der ASFINAG mit der örtlichen Bauaufsicht beauftragt.

  • image

    Auftragserteilung ÖBA Inzersdorf-Schön

    17. May 2021— Auf der A9 Pyhrn Autobahn wird der Abschnitt Inzersdorf-Schön im Bereich Straße (Freiland) und Tunnel generalsaniert. IGT in ARGE mit Geoconsult ZT GmbH wurde von der ASFINAG mit der örtlichen Bauaufsicht beauftragt.

  • image

    S16 Arlberg Schnellstraße Perjentunnel 2. Röhre

    01. December 2020— Verkehrsfreigabe im Richtungsverkehr nach 6 Jahren Bauzeit

IGT at the Austrian-Israeli Transport Infrastructure Forum in Tel Aviv

A transport infrastructure forum was organised by the Tel Aviv branch of the Austrian chamber of commerce as part of an official state visit by Federal President Alexander Van der Bellen in Israel. The President was accompanied by a range of renowned Austrian companies. In the infrastructure sector, and particularly tunnelling, Austrian technical expertise plays a significant international role, whereas Israel is a leader in innovation in the technology sector, leading to a situation ripe for exchange and cooperation. Israeli-Austrian economic relations have developed very positively in recent years and promise excellent opportunities for Austrian companies in the future.

IGT director Dietmar Bach met with representatives of the the Israeli construction industry and with decision makers from the the Ministry of Transport.

Contact

  • Salzburg/Austria
  • Schruns/Austria
  • Istanbul/Turkey
  • Legal Notice
  • Privacy Policy

Info

  • Support
  • Careers

Company

  • News
  • Fields of Operation
  • Company History
  • Management
  • Team

Services

  • Construction Supervision
  • Project Design
  • Structural Design
  • Geotechnics
  • Consulting
  • Inspections
  • Software Development

Projects

  • Upgrade of a historic transit route through Algeria
  • A10 Reitdamm Bridge
  • Semmering base tunnel
  • Perjentunnel
  • All Projects

Research & Development

  • Tunnel Structural Design
  • Software Development
  • Standards & Guidelines
  • Publications & Presentations
DE