News Open to traffic bypass Kastelbell The Kastelbell bypass was officially opened on Saturday, June 6, 2026. IGT provided the following services for this project: tendering and detailed design, as well as geotechnical engineering.
Good news from WTC 2026 Montreal Thanks to great commitment from the Austrian side, it has been possible to bring the WTC 2029 to Vienna. Leading the charge is our CEO Dietmar Bach, who personally pushed forward the bid to host the congress.
Start of works celebration at the City Tunnel Feldkirch Groundbreaking ceremony on March 6, 2026, at the Feldkirch city tunnel. Representing our team are Managing Director Christian Kitzler and Hans-Peter Seidl; IGT has been involved in this project since 2009. In addition to planning and environmental construction supervision, we are also responsible for local construction supervision (in a joint venture with 3G).
IGT at Geomechanics Colloquium in Salzburg Meet IGT at Geomechanics Congress in Salzburg 08.-10.10.2025
Brenner Basistunnel Durchschlag am BBT H53 09. May 2025— Ein bedeutender Fortschritt am Brenner Basistunnel (BBT) Baulos H53 konnte am 08. Mai 2025 gefeiert werden.
Contract award 2. SBSS München Ost 12. March 2025— IGT - in JV with Sweco, Gebauer Ingenieure, Inros Lackner and Vössing, has been awarded the site supervision of suburban railway track München Ost
Tunnel Vierzehn breaktrough 2nd tube 29. January 2025— S10 Mühlviertler Schnellstraße Breaktrough Tunnel Vierzehn
Target Cost contracts – panacea or deception? 18. December 2024— The Austrian Federal Railways held a workshop on Target Cost contracts (German: Allianzverträge) on 10th December 2024.
Hydraulic engineeringDesign, consultancy and management services for hydropower from feasibility studies to the design phase up to project approvals.