A10 Reitdamm BridgePrestressed concrete bridge on the A10 Tauern Motorway between Pongau Junction and Hüttau
Hydropower plant Landl: Works waterway refurbishmentRefurbishment of the in-situ concrete lining after more than 50 years of plant operation
Inn collective hydropower plant (Gemeinschaftskraftwerk Inn – GKI)Hydropower plant with bottleneck capacity of around 89 MW and standard output around 414 GWh
Obervermunt Plant (OVW II)An environmental impact assessment and statement were produced for the Obervermunt plant II with a turbine and pump capacity of 360 MW and design flow rate of 150 m3/s.
Vienna Metro Line U1/9 – Altes LandgutExtension of the line U1 - urban tunnel construction directly beneath the motorway junction Favoriten and the A23 bypass