Limberg III – Invert segmentInvert segments for the works water system of the Limberg III power plant
Hydropower plant Kühtai – Invert segmentTrio of invert segments for the 25.5 km long diversion tunnel Kühtai - Fernau
Hydropower plant Landl: Works waterway refurbishmentRefurbishment of the in-situ concrete lining after more than 50 years of plant operation
Alvier hydropower plant IIConstruction of the works water system and power generating cavern of hydropower plant with bottleneck capacity 424 kW and yearly output of 2.5 GWh in the municipality of Bürs, Austria.
Inn collective hydropower plant (Gemeinschaftskraftwerk Inn – GKI)Hydropower plant with bottleneck capacity of around 89 MW and standard output around 414 GWh
Obervermunt Plant (OVW II)An environmental impact assessment and statement were produced for the Obervermunt plant II with a turbine and pump capacity of 360 MW and design flow rate of 150 m3/s.