Tauern Motorway A10 Brentenberg – Site Supervision
Excerpt
Construction measures included significant refurbishment to two bridges and construction of the galleries of the Brentenberg tunnel
Three galleries were replaced and two bridges were refurbished on the A10 Tauern motorway between the Brentenberg and Zetztenberg tunnels. Construction works were completed in two phases in autumn 2012 and 2013. The grip of the concrete surface was improved with Epigrip, two existing waercourse protection facilities at the Brentenberg and Reit tunnel portals were brought up to state-of-the-art. Noise protection measures and vibration-absorbing tunnel cladding were installed in the Helserberg tunnel
Project Facts
-
Project
Tauern Motorway A10 Brentenberg – Site Supervision
-
Client
Asfinag BMG
-
Function
2012-2014 Örtliche Bauaufsicht
-
Costs
ca 4,3 Mio. EURO
-
Technical Facts
Länge Brücke S11 je Richtungsfahrbahn ca. 35m
Länge Brücke S15 je Richtungsfahrbahn ca. 96m
Länge Neubau Galerien Brentenberg Tunnel je Richtungsfahrbahn und Portal ca. 26-30m