S6 Semmering express road General refurbishment of Niklasdorf Tunnel

Excerpt

Site supervision and coordination for the general refurbishment of the Niklasdorf Tunnel and approaches during the procurement, construction and warranty phases.

The main refurbishment measures include:
– General repairs to the tunnel and associated exterior structures (control buildings, watercourse protection structures, pipework, road signs)
– Repais to approach roads in the open-air (carriageway, drainage, noise barriers) and a bridge over the Waltenbach valley
– Replacement of operational and safety equipment in the tunnel and approaches

Services

  • Site supervision
  • Geoetechnical advice
  • General coordination construction and systems

Project Facts

  • Project

    S6 Semmering express road General refurbishment of Niklasdorf Tunnel

  • Client

    Asfinag Baumanagement GmbH

  • Function

    Site supervision and general coordination

  • Costs

    € 26.4m net

  • Technical Facts

    1.35km-long twin-bore tunnel
    7km approaches, including 140m-long bridge over the Waltenbach valley
    Construction lot length 8.5km total

Print Factsheet