• Company
  • Services
  • Projects
  • Research & development
  • Careers
  • Contact
image
News

IGT at Geomechanics Colloquium in Salzburg

Meet IGT at Geomechanics Congress in Salzburg 08.-10.10.2025

image

Brenner Basistunnel Durchschlag am BBT H53

Ein bedeutender Fortschritt am Brenner Basistunnel (BBT) Baulos H53 konnte am 08. Mai 2025 gefeiert werden.

image

Contract award 2. SBSS München Ost

IGT - in JV with Sweco, Gebauer Ingenieure, Inros Lackner and Vössing, has been awarded the site supervision of suburban railway track München Ost

image

Tunnel Vierzehn breaktrough 2nd tube

S10 Mühlviertler Schnellstraße Breaktrough Tunnel Vierzehn

  • image

    Target Cost contracts – panacea or deception?

    18. December 2024— The Austrian Federal Railways held a workshop on Target Cost contracts (German: Allianzverträge) on 10th December 2024.

  • image

    Brenner Base Tunnel lot H52 winning project at ITA Tunnelling Awards

    11. December 2024— Gratulations and Glück Auf to the winning team!

  • image

    Celebration of Saint Barbara in Ebensee

    05. December 2024— Barbara Day celebration on power plant construction site Ebensee

  • image

    Final breakthrough Semmering Base Tunnel

    03. December 2024— Final breakthough on November 29, 2024

Salzburger Businesslauf 2021

Six of our valued colleagues gathered together to defend the honour of IGT at this year’s Businesslauf, determined by the sweat of their brows to overcome even the most gruelling of tasks our usually oh-so-mild hometown chose to throw at them. Unshakeable, proud and all-powerful, our athletes formed like a phalanx at the start line and proceeded to break through enemy lines repeatedly and with great force throughout this battle of wills.

Dietmar, braving the most treacherous of weather, the state of his running gear bearing witness to torrents of rain endured on the course, timed the use of his horsepower to perfection to chisel a veritable dream of a running tour into the venerable Salzburg cobbles. Eye witnesses report that his sheer speed rendered impossible any handover of an electrolyte-rich isotonic hop-malt-beverage, so rapid did he fly by the checkpoint in question. Such an obstacle couldn’t prevent him stopping the clock only a few seconds later than marginally younger colleague Dejan.

That the absolute top spot remained out of reach was quite possibly only due to the opposition’s observation of our brave combatants’ tactics. It remains unclear whether this was down to iniquitous snooping during training.

The fact that Bernd hat to step in for Stefan at short notice, requiring a late change of tactics, will have certainly caused some discomfort in our ranks, otherwise we would have been unstoppable!

Many thanks to Barbara, Dietmar, Alex, Dejan, Richard and Bernd. We are proud of you!

😊😊😊 

v.l.n.r Richard, Alexander, Dejan, Barbara, Dietmar, Bernd

Contact

  • Salzburg/Austria
  • Schruns/Austria
  • Istanbul/Turkey
  • Legal Notice
  • Privacy Policy

Info

  • Support
  • Careers

Company

  • News
  • Fields of Operation
  • Company History
  • Management
  • Team

Services

  • Construction Supervision
  • Project Design
  • Structural Design
  • Geotechnics
  • Consulting
  • Inspections
  • Software Development

Projects

  • Upgrade of a historic transit route through Algeria
  • A10 Reitdamm Bridge
  • Semmering base tunnel
  • Perjentunnel
  • All Projects

Research & Development

  • Tunnel Structural Design
  • Software Development
  • Standards & Guidelines
  • Publications & Presentations
DE