• Company
  • Services
  • Projects
  • Research & development
  • Contact
image
News

Order placed for new line Gelnhausen – Fulda

IGT-IL-GC-LAP Order placed for new line Gelnhausen - Fulda

image

Contract award for site supervision of Brenner Base Tunnel lots Wolf and H41

image

Geomechanics Colloquium 2021

The Austrian Society for Geomechanics will host the 70th Geomechanics Colloquium in Salzburg from 14.-16.10.201

image

Salzburger Businesslauf 2021

Zum heurigen Businesslauf versammelten sich sechs unserer geschätzten Kolleg:innen, um die Ehre der IGT zu verteidigen.

  • image

    Auftragserteilung Regionalstadtbahn Salzburg

    14. September 2021—

  • image

    S16 Arlberg Schnellstraße Arlbergtunnel Teilsanierung 2

    21. May 2021— Auf der S16 Arlberg Schnellstraße wird der Arlbergtunnel einer Teilsanierung unterzogen. IGT in ARGE mit Lechner & Partner und 3G Geotechnik wurde von der ASFINAG mit der örtlichen Bauaufsicht beauftragt.

  • image

    Auftragserteilung ÖBA Inzersdorf-Schön

    17. May 2021— Auf der A9 Pyhrn Autobahn wird der Abschnitt Inzersdorf-Schön im Bereich Straße (Freiland) und Tunnel generalsaniert. IGT in ARGE mit Geoconsult ZT GmbH wurde von der ASFINAG mit der örtlichen Bauaufsicht beauftragt.

  • image

    S16 Arlberg Schnellstraße Perjentunnel 2. Röhre

    01. December 2020— Verkehrsfreigabe im Richtungsverkehr nach 6 Jahren Bauzeit

Salzburger Businesslauf 2021

Six of our valued colleagues gathered together to defend the honour of IGT at this year’s Businesslauf, determined by the sweat of their brows to overcome even the most gruelling of tasks our usually oh-so-mild hometown chose to throw at them. Unshakeable, proud and all-powerful, our athletes formed like a phalanx at the start line and proceeded to break through enemy lines repeatedly and with great force throughout this battle of wills.

Dietmar, braving the most treacherous of weather, the state of his running gear bearing witness to torrents of rain endured on the course, timed the use of his horsepower to perfection to chisel a veritable dream of a running tour into the venerable Salzburg cobbles. Eye witnesses report that his sheer speed rendered impossible any handover of an electrolyte-rich isotonic hop-malt-beverage, so rapid did he fly by the checkpoint in question. Such an obstacle couldn’t prevent him stopping the clock only a few seconds later than marginally younger colleague Dejan.

That the absolute top spot remained out of reach was quite possibly only due to the opposition’s observation of our brave combatants’ tactics. It remains unclear whether this was down to iniquitous snooping during training.

The fact that Bernd hat to step in for Stefan at short notice, requiring a late change of tactics, will have certainly caused some discomfort in our ranks, otherwise we would have been unstoppable!

Many thanks to Barbara, Dietmar, Alex, Dejan, Richard and Bernd. We are proud of you!

😊😊😊 

v.l.n.r Richard, Alexander, Dejan, Barbara, Dietmar, Bernd

Contact

  • Salzburg/Austria
  • Schruns/Austria
  • Istanbul/Turkey
  • Legal Notice
  • Privacy Policy

Info

  • Support
  • Careers

Company

  • News
  • Fields of Operation
  • Company History
  • Management
  • Team

Services

  • Construction Supervision
  • Project Design
  • Structural Design
  • Geotechnics
  • Consulting
  • Inspections
  • Software Development

Projects

  • Upgrade of a historic transit route through Algeria
  • A10 Reitdamm Bridge
  • Semmering base tunnel
  • Perjentunnel
  • All Projects

Research & Development

  • Tunnel Structural Design
  • Software Development
  • Standards & Guidelines
  • Publications & Presentations
DE